Although the Haitian government is in full support of this project and has promised to provide staff once it is completed, they simply do not have the funds for construction, leaving Dr. Maklin responsible to find support for the project.

Although construction wanes as funds run low, every dollar makes a difference! Below are the needs for the hospital, and what a difference every dollar will make. 

Doors and Windows: $20,309 Total

  • Emergency Room and Laboratory: 14 needed = $2,825
  • Internal Medicine: 7 needed = $924
  • Pediatrics: 3 needed = $910
  • Consultation Rooms: 15 needed = $2,500
  • Administration Room: 7 needed = $2,800
  • Cafeteria: 4 needed = $600
  • Operating Room: 5 needed = $2,000
  • Sterilization Room: 4 needed = $1,550
  • Lecture Room: 8 needed = $1,860
  • Recovery Room: 12 needed = $2,080
  • Maternity Room: 7 needed = $2,260

BUILDING TILES: $22 per sq/m = $27, 376 total

  • Operating Room: $1,174
  • Sterilization Room: $684
  • Lecture Room: $1,041
  • Porch: $4,473
  • Recovery Room: $684
  • Maternity: $1,759
  • Administration Room: $1, 557
  • Cafeteria: $1,315
  • Stairs: $892
  • Porch #2: $5, 930
  • Emergency Room: $1,619
  • Pediatrics: $1,632
  • Internal Medicine: $1,736
  • Laboratory:$1,204
  • Consultation Rooms: $2,011
  • Bathrooms: $1,925

BUILDING MATERIALS - $4,888 TOTAL

  • Cement: $8 per bag - 524 bags needed = $4,192
  • Grout: $18.80 per bag - 30 bags = $564 total
  • Soft Grout: $22 per bag - 6 bags needed =$132
  • Benches: 20 needed - $800

EQUIPMENT

  • Desktop Computer: 5 needed = $6,250
  • Laptops: 10 needed = $7,000
  • Scanner/copy/printer: $500
  • 32" TV: 2 needed = $500
  • Ambulance
  • Pickup truck
  • Generator (Diesel 120KW)
  • 24 Solar panels 275 W
  • 24 Inverter Batteries 200A
  • Inverter 5.5KW and Converted